K.R.KANAGATA Co.,Ltd. Produces rubber mold plastic mold and other mold

Operation Flow
Production Process
Design
Task Model
The first step of drawing id drawing the plan. The customer can specify the percentage of the construction in the product. For the raw material, the company has 2 kinds of raw material including plastics mold and rubber mold to using in design according to wishes of the customer under design controlling.
Model Mold
Design, which consists of a team of technicians with over 10 years experience in design by using VISI V20 SOFTWARI to design. After the design is complete, we will have to talk to customer about size of product and production line. If the customer agree, we will start the process of production.
Production
Mining
For general work, we used DAHLIH 2 and EVEROX 1 but if the product has a higher segment, we will use MORISEIKI, which it can help you to reduce the cost and provides better production process and fast
EDM
EDM is the machinery that has different from other machinery. EDM enhance productivity with high speed and high accuracy. We form up the electrode in the company. Most of electrode made from copper; in the other hand if the product is very large, we will use graphic because it is light weight, cheap and good quality.
Assembling and Polishing
The last step is to polish surface and contains work by employees who have experienced a long time.We are able to adjust work surface according to the needs of the customer.
このページのトップへ